Day 461

Hey, hey!

There has been good progress this week as we enter the “home” stretch.

We have lighting! They won’t install the decorative fixtures until the painting is done (because this isn’t my first rodeo and and I know how that goes and don’t want them to be damaged).

Fun fact: I arrived on Tuesday and they were installing recessed lights. I noticed that they were installing gimbal lights everywhere. I mentioned that I had specified gimbal lights on my reflected ceiling plans in just a handful of places (8 total out of 40+ on the recessed lights) and wasn’t sure why all of them were being installed as gimbals. I said no problem to install gimbals everywhere as long as it wouldn’t be at a greater cost (which I knew it would be). After a review of the play on the field, it turns out our builder didn’t catch it on the order and it would have been a $1000+ cost increase to install all gimbals, so they quickly started replacing those gimbals with the 4″ LED, 2700K, dimmable, fixtures I had specified to begin with (in great detail).

(stepping off soap box)

I delivered the cupola this week!

It arrived to our current address like this:

They had called to let me know that the driver would *call* and schedule a delivery window. Well, no call came, and though I was home, no one rang the door bell or in any way let me know they were on their way, so they decided to show up and dump this 100+lb pallet in my flower bed. This company will be receiving a detailed customer experience review from me.

In other news, all of the tile is complete and they have grouted everything. The kitchen backsplash is looking lovely.

In this photo, the grout is still wet and thus darker than it will appear dried. I came in and commented about the darkness of the grout and was told not to touch…

So, I went upstairs to check out the master bath.

The shower is in and looking enormous.

The hidden niches are going to keep things looking halfway decent on a daily basis.

Not that anyone will be seeing this other than the two of us…

Speaking of things no one else will see (including me, hopefully) Joshua’s closet is coming together! I am calculating how to fit a wall-mounted ironing board into this setup. I have an outlet for the iron, but am still doing some math on the clearances once there is clothing hanging. I’ll make it work.

In other exciting news, they have almost finished the stairs!

Our base newel post is gigantic and I love it. It’s going to be stunning once it’s stained.

The fireplaces are really coming together with all of the mantel surrounds in place.

Cannot wait to see these painted!

Speaking of painted, everything is being covered up, taped off, and primed, so it all looks like a version of this.

My final paint schedule has been submitted and I can’t wait to see each room come to life!

Meanwhile, Barry D. (my dad) has been working on the library built-ins in his “shop” (garage) at my parents’ house.

It will be so special to have something he built in our house.

I have selected these pendant pulls for the built-in cabinet hardware, which I realized are very similar to the pulls my grandmother had in her kitchen at her 1890’s home she remodeled in the 1960’s.

It’s funny how deeply the spaces we grew up in influence our lives, though it’s not always obvious. I am constantly asking my clients to dig deep into the homes that have influenced them. And, now, being the “client”, I realize how unconscious many of these influences can be until they are pointed out to you.

On top of all of the exciting progress, I had a special visit from my friend Jessica and her daughter, Sophia.

We had planned to take a long walk, but it was quite brisk and windy so we did a short walk along the property perimeter. Along the way, Sophia stopped many times to say hello to our neighbor’s horses and by the end of the walk, she insisted on wearing her mother’s gloves, where were the size of her head.

I convinced her shortly thereafter that a snack on the front porch would be a good idea. She proceeded to outeat both me and her mother, while also managing to fit in a wave to the painters inside every few minutes.

Lastly on site, they’ve installed the garage sconces.

Meanwhile, at our current house, the packing has begun.

Bu is helping, as always.

Day 447

Happy New Year!

The house continues to look more like a house each day, though we are *still* waiting on the county to hook us up with some electricity(!) Until we have power and are able to connect the HVAC and condition the house, we can’t proceed with grout, paint, staining floors, etc.

In the meantime, we are moving forward with everything else we can.

The balustrades are looking lovely.

The hall bath is looking classic and precious. The chair rail tile really makes my day.

The guest bath tile is complete, except for the grout.

Downstairs, the Dining room and Library fireplace surrounds are starting to look fabulous. Can’t wait until they put up the mantel surrounds!

But what really brings me joy is the entry checkerboard floor. I have wanted one of these my entire life.

I am also extremely excited about my closet. I had the trim guys build in a dresser for a more furniture-like look and I was a little nervous about them understanding my design intent, but they did a really nice job. Can’t wait to see the unfinished wood painted!

Meanwhile, outside, they have been working on the porches. The screened porch columns are in place but not yet trimmed out.

They also placed the massive classical columns on the front porch and side entry.

I am in love.

Though they still need to finish the trim at the top and paint them to match the house, they make a huge difference in the overall look.

Thanks to our neighbor for this photo of the snow we got last week!

I got to see it Friday when I arrived for my site meeting. Can you see the columns in the distance?

Now we need the shutters, which will really complete the exterior look.

The end is in sight! I’ve already started purging and prepping…

Day 437

I may need to camp out on site to keep up with all of the progress these days!

The hall railing is up. I’m glad I didn’t value engineer the baluster choice. I love these.

We have a shower curb. Try to contain yourself.

We now have gutters and downspouts. These were not a custom color-match but we got pretty close!

Working out the details for the porch columns – Josh is super excited to see these go in.

The penny round floor looks super cute in the hall bath! We had a major snafu with this as they originally sent the wrong color. I wanted “antique almond” (beige) and they sent “milk”, which was a blueish white. Not close. This is why we check everything at every stage. Of course, then the correct color was discontinued and there wasn’t enough material to cover the floor. So I had to hunt down another vendor who had a similar color and expedite it. This is the story of my life.

We have laundry basket cubbies just in time for the countertop template this morning. I am strangely excited about these.

The guest bath is shaping up with wall tile!

Glad to be heading into the new year with the end in sight!

Day 434

We are moving at quite a clip!

Master tile is underway.

Our shower valves have blankies so they don’t get too cold.

Master vanity is in. The tower and fronts will go on after the countertop is installed.

Butler’s pantry cabinets installed by yours truly and my A-team (Dad, Josh, Julia, and Nate). I’m already plotting to paint these cabinets, the walls, and the trim a deep, moody color.

And laundry cabinets. The trim guys will build laundry basket cubbies in the middle so I can have a big folding surface along this wall.

The farm sink will be Bu’s spa. He’s excited…not.

I am just smitten with the brick floor in the mudroom, the tall baseboards, the dutch doors, and the transoms.

But, the true love of my life is the kitchen.

I’m dead.

I can’t even.

Ok, back to the progress report.

Stairs!

Newel posts and balusters. Our base newel post is massive and I love it.

The top of it is almost as big as my head!

Outside, the porch ceilings were going in and the gutters and downspouts were being installed as I was leaving this morning.

Lots of things happening!

Day 428

We have officially entered the stage of interior finishes.

Translation: pretty stuff is going in.

The library is packed with all of the interior doors that they started installing today.

We have a lot of doors.

Master bedroom and closet doors…and master bath tile waiting patiently to be installed tomorrow…

And my Dutch doors! Can’t wait to see these in the mudroom. The trim guy sent me into a panic this morning when he called to asked where “the doors that are cut in half” go. I was about to tell him “back to the supplier” until it occurred to me that he was talking about the Dutch doors.

The trim guy and I also went over my transom details today. I’m *so* excited to see these go in. Major new old house detail.

They are getting ready to start on the trim, an element that can make or break a house. This, my friends, is not an area to skimp on. Case in point: we are doing 9 1/4″ tall baseboards downstairs and 7 1/4″ tall upstairs. Merry Christmas to me!

Other exciting things: floors!

The hardwoods are in (though they won’t be sanded and finished until the end (which is a good thing because I would be the floor scratch police otherwise)).

A peek into the kitchen from the rear hall. Cabinets coming Saturday! This view will look quite different in a week.

I can barely contain myself.

The mudroom brick floors are in. The grout will really take it over the top, but that won’t be happening until there is heat in the house (which is still a few weeks a way thanks to county electric nonsense).

Last exciting thing for the day: guest bath floor! I am a sucker for a classic basketweave.

I’ll be back out to Meadowcrest tomorrow to meet with my door hardware guru and to see other developments on the door, trim, and tile fronts.

Stay tuned for rapid fire updates over the next two weeks!

Day 418

Well folks, we have drywall!

Living Room.

Dining Room.

Dining room through to library and a peek into the kitchen on the right.

Kitchen…and Joshua.

Stairwell up to the studio.

Studio…in need of railing…

Front stairwell in need of a railing upgrade.

Guest bath.

Hall bath. Tile guys are getting all of the floors prepped to start tiling next week!

Master bedroom.

Tile, waiting patiently to be installed. Hardwood floor installation starts Monday, too!

And…garage doors have been installed. They will be painted black to match the other exterior doors, but I am in love.

We are entering the exciting phase when all of the “pretty things” are installed over the next two months. Stay tuned for tile, cabinetry, trim, doors, countertops, appliances, hardware, lighting and plumbing fixtures, and all the other things HGTV leads you to believe can all be installed in three days.