It has been another week dedicated to electrical wiring, plumbing piping, and HVAC ducting.
Are you still there?

Just thrilling.

They used the template provided by the tub manufacturer to cut out the tub deck.
Unfortunately, they did not consult me on placement before they did this and the cutout is too close to the windows. But that is easily fixed.

Though I’m glad we will have adequate ventilation in the house, I cannot wait until it’s time for drywall and all of the ducts and returns are out of sight.

I’m sure it’s all very efficiently run, but this ceiling looks like a hot mess to me.

Meanwhile, outside, part 1 of 27 of the electrical to the house has been inspected and approved so John has filled in a section of the ditch wide enough for a vehicle to pass over. He also started spreading gravel up the rest of the driveway while I was there. It was exciting to see the beginnings of the circle drive!

We’ve also been working hard on finalizing orders this week as raw materials seem to be skyrocketing in price.
We’ve been trying to pick our spots and make some trade-offs to stay in budget. The herringbone brick floor in the mudroom and the heated floors in the master bath are on the chopping block. My dear husband offered to start driving for Uber Eats so we don’t have to give up these features. I’m sure he’ll have no problem squeezing that in between working a full-time job, getting his MBA, and building a house.
We decided on #1 red oak instead of select, which has no knots and less tone variation from board to board. Josh and I agreed that we’d like a little more character in our hardwood floors and this was a good area to save some money. This showroom sample has no stain on it so it’s much lighter than our floors, which will be stained dark walnut.
Though the hardwoods will likely be installed in the next month, they will not be stained until the very end of the build, so it will be a while before we get to see the full effect.

Our builder and I had a long meeting yesterday to finalize exterior trim, siding, columns, and garage doors, as well as interior trim, doors, transoms, stair parts, and miscellaneous millwork.
As I was double-checking the door quote today, Bu decided to make himself a little napping Bu-rrito in the house plans. He stayed like this for over an hour. I’ll take it as a sign that he’s excited about the new house.