Day 304

We are in the not so sexy stage called “rough in”. It is during this stage that they put in the guts of the house, which are critical for it to function, but not the most photogenic.

The electricians were placing all of the housings for lighting and putting in switch and outlet boxes. My electrical plan was so detailed that the electrician only had 3 questions for me. Not bad for several hundred components, if I do say so myself.

It is always my goal to leave absolutely NO room for interpretation when it comes to electrical plans. I’ve seen far too many switches *centered* on large walls across from the entrance to a room.

Not in my house.

Electrical panels boxes, easily accessible in the garage.

Slightly more exciting than the electrical, they’ve built the tub deck for the master tub.

I’m hoping they will enlarge the opening for the tub or the cat will be the only household member able to use it.

They’ve started on the roof as well…which will be super handy once they have it complete.

Handy because we arrived yesterday to check on things just in time for a torrential downpour. Conveniently, they had just dug the ditch for the electrical lines, which runs right across the middle of the property, between the house and the driveway and all the way around to the back of the garage.

We put Barry’s truck in 4 wheel drive and hoped for the best.

On the bright side, I got some good wide angle shots of the house as we slid through the mud all the way around the house.

The electrical ditch basically had the effect of a moat. So, now we know what that’s like in case we ever want one.

For now I think we’ll stick with fences to secure the perimeter.

Speaking of, my dad and Josh have almost finished the fence. It’s looking mighty fine!

Day 238

So, they were supposed to pour the garage and basement slabs Monday or Tuesday.  The weather was uncooperative (thank you, Cristobal) so that didn’t happen.  I decided to drive out to the property on Tuesday between meetings on the off-chance that it wasn’t raining there and there was concrete being poured.

It was raining heavily.  And there was no concrete being poured.

61341509472__9C89F6E2-148D-4EF7-8779-668535565ADF

This photo was taken shortly before I stepped out of the car and my foot was nearly swallowed whole by the mud.

61341613875__D6526197-94D9-43CB-A050-EE0D296CC83F

This was after 10 minutes of cleaning.

There was only so much I could do with a roll of paper towels and a travel size bottle of hand sanitizer.

Also, did I mention I was between meetings?  As in, after this I had another client meeting?

Thankfully, I had a pair of flip flops in the car.  Hopefully that is the first and last time I will wear flip flops to meet a client.

Moving on.

We had an early morning meeting with our builder today and we were pleasantly surprised how much had happened since the shoe incident on Tuesday.

IMG_5153

They were pouring the garage slab as we arrived.

Maybe I should ask them where they got their boots…

IMG_5169

The also poured the basement steps today.  The basement slab will be poured tomorrow.

IMG_5158

At least I didn’t step in wet concrete…

IMG_5155

The lumber was delivered yesterday (on schedule!) and they got quite a bit done in one day.

IMG_5163

This makes me so happy.

IMG_5151

This forecast makes me and my shoes even happier!