Day 331

Well, well, well…

We have a well!

I stopped by for a quick site visit this week and this was happening in the backyard.

It amazes me that they can do this all in one day.

Mostly because of what they charge for this.

Nonetheless, I am THRILLED that we have a well, and therefore, a water supply. We are waiting on the official report, but our builder told us that they were somewhere around 140 feet down and getting 15 gallons per minute.

Continuing the exciting infrastructure tour, Walt, our builder, is seen here pointing to where the propane tank will be buried behind the garage.

And, lastly, here is the electrical thinger. It will have a cover and we can plant some shrubs strategically to block it from view as you come up the driveway.

We’ve been watching Yellowstone, Longmire, and now Justified lately so I am really feeling my 10 gallon hat shadow in these photos.

In other news, we have exterior doors! Front door…

French doors from the living room to the screen porch. I have a thing for French doors so these make me especially happy.

Kitchen door to the screen porch.

I’m also obsessed with transoms. There will be many throughout the house.

OK, back to the exterior: John graded the hill by the garage and it looks approximately 1 million times better.

They also put in the gravel driveway up to the garage, which means, were there not a bunch of supplies and bathtubs in the garage, I could park in the garage!!!

I will be doing this the first chance I get.

Having the hill graded meant it was time to seed and straw. This was our project yesterday morning. Here is Barry (my dad) loading up the erosion control matting at the local Farmers Co-op. I predict we will be back here many times over the next few decades.

My Dad and Josh did a fine job getting all of the matting and straw in place.

My job was to spread the seed. The workers did not know what to make of this. One day, I show up in business casual attire and am telling people what to do. The next day, I am wearing yoga pants and a fedora, spreading grass seed.

I like to keep them guessing.

The masons are almost done with the first chimney.

And they have started on the second.

We REALLY need them to finish the chimneys so the roofers can finish the flashing and put on the roof.

My other order of business yesterday was to paint some samples for the exterior.

I LOVE this color. It’s Benjamin Moore “Limestone”.

The exterior is coming along. I can’t wait to see the whole thing painted!

Day 311

Our moat is working well and keeping delivery trucks at bay. (sigh.)

They were trying to deliver our exterior doors in this picture, but unfortunately our plywood bridge here was not going to cut it.

It is strictly a pedestrian bridge. A very small pedestrian bridge, for very small pedestrians.

I safely crossed the bridge several times; however, I will be very relieved once the electrical has been inspected and approved, and the ditch can be filled in. I am hoping this will happen tomorrow.

Somehow, these bricks showed up for the chimneys…

Inside, there has been progress on the mechanical, electrical, and plumbing systems (MEP). At our site meeting, I walked through with the builder and the electrician to verify placements.

The electrical foreman’s name is “Country”. Now, when our builder told us the electrician “Country” was coming, I had in my mind that this man would look something like Blake Shelton. “Country” is neither tall nor cowboy-like. No, in fact, he is a stout, hispanic man who is about my height, which, for the record, is 5′ 4 1/2″.

Because I had very detailed electrical layouts for him, which I assume made his job easier, we are now best friends.

Now taking suggestions on what my construction nickname should be.

“Country” and his crew have been busy wiring the upstairs.

(This is my husband Josh in the picture. Not “Country”.)

The HVAC guys have most of the ducting in place.

And we have some plumbing! These are drain lines for the mater bath sinks.

Kath has hot and cold supply lines in the guest bath! She’ll be tickled.

These nooks in the mancave and studio came in handy for all of the HVAC.

Just a few more pieces of plumbing to put in. (yikes!)

I give them an A+ for organization.

And they finally remembered to frame in the basement access!

I took a class in Phenomenology in graduate school and for some reason this photo reminds me of a spa we studied in Japan. It was all about a sensory experience with light, touch, and sound.

OK, time to end the interior tour.

Out front, our baby volunteer trees are starting to grow. Just another 50 years or so until they’re as tall as the others.

Hopefully the house will be done by then.