
Our moat is working well and keeping delivery trucks at bay. (sigh.)

They were trying to deliver our exterior doors in this picture, but unfortunately our plywood bridge here was not going to cut it.
It is strictly a pedestrian bridge. A very small pedestrian bridge, for very small pedestrians.

I safely crossed the bridge several times; however, I will be very relieved once the electrical has been inspected and approved, and the ditch can be filled in. I am hoping this will happen tomorrow.
Somehow, these bricks showed up for the chimneys…

Inside, there has been progress on the mechanical, electrical, and plumbing systems (MEP). At our site meeting, I walked through with the builder and the electrician to verify placements.
The electrical foreman’s name is “Country”. Now, when our builder told us the electrician “Country” was coming, I had in my mind that this man would look something like Blake Shelton. “Country” is neither tall nor cowboy-like. No, in fact, he is a stout, hispanic man who is about my height, which, for the record, is 5′ 4 1/2″.
Because I had very detailed electrical layouts for him, which I assume made his job easier, we are now best friends.
Now taking suggestions on what my construction nickname should be.

“Country” and his crew have been busy wiring the upstairs.
(This is my husband Josh in the picture. Not “Country”.)

The HVAC guys have most of the ducting in place.

And we have some plumbing! These are drain lines for the mater bath sinks.

Kath has hot and cold supply lines in the guest bath! She’ll be tickled.

These nooks in the mancave and studio came in handy for all of the HVAC.

Just a few more pieces of plumbing to put in. (yikes!)
I give them an A+ for organization.

And they finally remembered to frame in the basement access!
I took a class in Phenomenology in graduate school and for some reason this photo reminds me of a spa we studied in Japan. It was all about a sensory experience with light, touch, and sound.
OK, time to end the interior tour.

Out front, our baby volunteer trees are starting to grow. Just another 50 years or so until they’re as tall as the others.
Hopefully the house will be done by then.


















There are dozens of videos of this man carrying in stacks of 2x4s like this one. He must have shoulders of steel. Each time, he gracefully managed to carry over 100 pounds of lumber as he walked the plank into the house.














I think there has been more progress in the last week than in the last 8 months combined! I can barely keep up and I’ve been out there almost every day this week to check on things.




