It is looking more and more like we may actually get this house built!

Today, they poured the basement walls.  We arrived just as the pump truck was departing.

IMG_4801

Check. It. Out.

IMG_4795

Word is these forms will likely come off tomorrow.

This whole “forms and pouring concrete” process blows my mind.

IMG_4794

This lovely little section is where the exterior steps to the basement will be.  There will be a lot of dirt filled in around it once the forms are removed.   Thank goodness.

We will probably use this access 12 times in the next 50 years, but hey, we will be glad we have it when we need it.

IMG_4784

The view from the top of Pride Dirt Pile.

IMG_4787

Also, many piles of split face concrete block have arrived for the non-basement parts of the house where we will have a crawl space.

While I may use the exterior basement stairs on occasion, I hope I never experience the crawl space firsthand.

IMG_4805

John (earthwork guy) was busy moving and distributing Pride Dirt Pile because he has to dig a lengthy trench for the electrical that will run from the start of the driveway all the way to the far corner of the garage.

It sure is great to have so much space until you have to put in the infrastructure for utilities.

IMG_4779

On the bright side, “Meadowcrest”, as we’ve named our property, is looking super meadow-y out front.