Day 203

Just over 200 days in and there is cause for celebration!

We have footers, y’all!

The weather has been uncooperative, per usual, so after a lot of back and forth, they decided to dig the footers and pour them all in one day to beat the rain.  Josh and I headed out to the property after work/meetings just in time to catch the last few minutes of pouring around 6PM.

IMG_4633

I could not believe my eyes when I turned onto the easement road and saw this machinery as tall as a skyscraper!

OK…slightly taller than the trees.

IMG_4636

This is some major equipment.

IMG_4644

John, our earthwork guy, inspecting everything.

This looks like ancient ruins to me so I’m glad someone knows what’s going on.

IMG_4676

I’ll be honest.  When they said they were pouring the footers, I had no mental picture of what that was going to look like.  I’m not even sure I would have gotten it right on multiple choice.

I might have guessed they would look more like big blobs or squares of concrete rather than a strange concrete maze.

Good thing I’m not in charge of this operation.

IMG_4693

Josh is much more familiar with concrete pouring so he was eager to check it out and walk dangerously close to the edge of the wet concrete.

IMG_4695

Here he is walking through the hall into the dining room.  I’m imagining many lovely, leisurely meals in that room, soaking up the golden hour.

IMG_4689

After those lovely meals, we can head out to the front porch to watch the sunset.  This is where the front steps and porch will be.

IMG_4678

This terrifyingly narrow and deep trench is for drainage.  Josh is a major drainage nerd so he was delighted to see this.

I was less delighted, but still appreciative of the water mitigation planning.

IMG_4673

I still can’t believe this is real.

2020 has been the most bizarre year of our lives.  Though we have had sadness and challenges, we have so much to be thankful for.  Building our forever home brings us a lot of joy in the process and in the hope of many happy times to come.